Progress is moving fast on the Dripping Springs Refresh project. A few snap shots from todays visit, include finish work on the primary bedroom's bathroom and walk-in closet.
Our interior design services included demolition and new construction drawings, along with documenting the entire house (no blueprints were found) and an exterior deck design.



The house originally had one shared bathroom (shower and toilet only) between the two rooms. Each room had its own sink / vanity. Our design deleted the two separate sinks and expanded the restroom.
A closest was demolition to make the room larger and relocated. Pocket doors allow more space within each room.

To learn more about this exciting project, please check out our project page.
Comments